Decided to build out the ceiling next, so that I can start hanging pipes and belts from it.
Piping run out for the two main Heavy Oil Residue lines, one for Rubber, one for Plastic.
You must log in or register to comment.
Decided to build out the ceiling next, so that I can start hanging pipes and belts from it.
Piping run out for the two main Heavy Oil Residue lines, one for Rubber, one for Plastic.