

Fairing separation confirmed.
Alt accounts that are also me:


Fairing separation confirmed.


MECO, stage separation, and upper stage ignition.


Spectrum has passed Max-Q.


Liftoff!


Propellant load is underway.
T-0 has slipped to 20:12 UTC, 22:12 local.


Joint ISAR / NSF webcast is live: https://www.youtube.com/watch?v=uUc2d_NPBN0
Cornfinement?


there any other potential sources of energy I haven’t thought of?
Wild card answer: Someone turned the Demon Core into a doorknob.


Is that a chocolate door handle?


Ooh, starting a new saga!


He tends to go on vacation after they successfully launch though
He does? He certainly wasn’t on vacation during Artemis II:
I don’t think there have been enough Artemis launches that one can infer a strong correlation to Eric Berger’s vacation days :)


Orbital parameters from Jonathan McDowell: https://bsky.app/profile/planet4589.bsky.social/post/3mupvwwwddk2c
EOS-05 (GISAT-1A) and the GSLV CUS upper stage cataloged by USSF in a 154 x 30963 km x 19.3 deg transfer orbit, confirming successful launch by India


2026-09-04:


2026-09-03:


Still no orbital parameters for this launch, per Jonathan McDowell: https://bsky.app/profile/planet4589.bsky.social/post/3muly5ypiak2z
It is now clear that Space Force will not be cataloging the Pallas-1 (Zhishenxing-1) launch. Galactic Energy have not announced any achieved orbital parameters (perigee, apogee, inclination). So, I must regard success of the launch as not confirmed at this point.


Orbital parameters from Jonathan McDowell: https://bsky.app/profile/planet4589.bsky.social/post/3mulxzhdixk2z
StriX-9 cataloged as 2026-201A (100561) in a 538 x 582 km x 38 deg orbit


EOS-05 separation confirmed!
Mission success.


Stage 3 shutdown confirmed.


Stage 2 shutdown, stage separation, and stage 3 ignition confirmed.




















SECO, tentative 500 x 180 km orbit.
There is still a scheduled circularization burn.